Find Water Treatment, Water Treatment Plant, Sub-Catchment on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Inquiry Basket (0)
Home > Products > Water Collectors > Manifold/Water Segregator and Collector Water Treatment

Manifold/Water Segregator and Collector Water Treatment

Basic Info

Model No.:  YLD

Product Description



Model NO.: YLD


Usage: Environmental Protection, Chemical Industry


Style: Vertical


Certification: CE


Material: Carbon Steel


Work Pressure: 1.0MPa


Design Pressure: 1415psig


Gas Flow Rate: 60mmscfd


Specification: CE, GSG


HS Code: 8421219990




Type: Water Segregator


Motive Force: Water


Performance: Water Segregator


Product Name: Water Collector Manifold


Water Temperature: 0-90centigrade


Fluid Handled: Oil, Gas and Water


Operating Pressure: 750-1200psig


Trademark: YLD


Origin: Jiangyin, Jiangsu, China


Product introduction

Floor heating system should be designed into several loops based on the functions of buildings and requirements of each room. Warm water segregator is used to distribute loops. Manifold is the technical name for water segregator; Its working principle is that water segregator distributes water from inlet pipe to several branch pipes and water circulates in branch pipes; Water collector collects water circulated from branch pipes and distributes water back to return pipe. Manifold is composed of water segregation pipe and collection pipe. Water segregation pipe is connected to the water supply pipe of pipe network system, with the main function of distributing hot water from pipe network system to rooms in the need of floor heating through floor heating pipes buried under floor. Hot water delivers heat to floor when flowing in floor heating pipes, and dissipates heat from floor to the whole room.



Scope of application

1. Production, living, bathing and fire water supply system for industry and civilian construction.

2. Hot water supply system, floor expansion tank for air conditioning and heating system.

3. Prevent water supply maintenance system from temporary suspension because of insufficient water pressure, storage for living and

Inlet valve

Production water in timing water supply areas.







MOQ

1 set

Depature port

Any Port of China

Terms of payment

1.30% TT in advance,balance against B/L copy
2.L/C at sight

Price terms

FOB, CIF, CNF

Delivery time

within 7-15 days after receiving your order or customerized









Contact us if you need more details on Manifold. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Water Collector、Muffler. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : Water Collectors